Kitchen in progress

Here is a recap of the first weeks of construction: Floor being patched, walls open for electrical. Day 10.

IMG_1728Beams boxed in, walls getting closed up, Day 16, above.

IMG_1743

Pickles on the test patches, above. This is the floor we picked, below. ‘Jacoby’ stain on sanded red oak. The patched areas should pretty much disappear.

IMG_2287

Walls getting closed up. Note 3 windows to the left because they are about to be removed. Floors are done but covered to protect them. Day 25 below.IMG_2153

Windows gone, LED lights! Day 28nowindow.

New window and wall finishing, Day 32, below.IMG_2214

Getting closer, cabinets starting to go in, Day 34, below. Color of cabinets is creamier than I remembered. Good thing the paint I picked is a tiny bit warmer than the paint colors in the other rooms, Benjamin Moore: Swiss Coffee on the walls. IMG_2260

This was a great idea Ann came up with, replacing the window over the new sink location really opens up the room, it’s going to look great. IMG_2269

 

IMG_2322